Engineering

The product spec sheet approved before the factory starts.

See the system with my own data
Develop · Sales · Product engineering
A part’s record open on the routing: six manufacturing operations in order, each with machine, quoted hours per part, parts per hour, changeover time and value.
A real system screen, with sample data. The screens are in Portuguese today.Scroll sideways to see the whole screen.

The part record, on the manufacturing routing. A real system screen, with sample data. The screens are in Portuguese today. Scroll sideways to see the whole screen.

How it usually works

The part’s record is a folder of loose files

The drawing in one place, the cost in a spreadsheet, the tax code in an old email from the accountant.

Someone else registers the part again, with a different description — and now there are two identical parts.

With the module

One record, and it becomes the product

  • The part comes in inheriting what was quoted
  • Engineering fills in the rest
  • Development has phases with dates
  • Approving mirrors it into the product records
What the record holds

The tax and sales side

  • Tax code, taxes and the part’s net value
  • Thirteen invoicing operations: sale, return, shipment, sample, donation
  • Price, payment terms, delivery lead time and commission
  • Target margin next to the current margin

The technical side

  • Diameter, length, width, thickness and weights
  • Production routing with sequence, machine and time per part
  • Parts per hour calculated, not typed in
  • Quoted operations next to actual operations

Cost and proof

  • Cost from four sources: raw material, outside processing, material and labor
  • Development in sixteen phases, with planned and actual
  • Spec sheet consolidated into one PDF, history included
  • Automatic history, written in plain Portuguese, of everything that changed

Talks to Master Data, Projects, Quality, Production, and Invoicing.

Want to see the record for one of your parts put together?

See the system with my own data

A reply by email within one business day, from a person on our sales team — not a bot.

FAQ

Type your question and press Enter: the answer opens right below, in the list.

Will I have to register the part twice, here and as a product?

No. Approving the item creates the product; approving it again updates the mirrored fields. The record becomes the source of truth for that product.

I approved it with the wrong tax code. Now what?

There’s a reopen-to-edit option: the item goes back to draft, you correct it and approve it again. The history records what changed, from one value to the other.

My company isn’t automotive; I don’t use that kind of development process.

The review tabs are optional and the record works without them. Those who use them get both views, quality and sales, with the same structure.

My cost has more than material and labor.

There are four separate sources — raw material, outside processing, resale material and labor — each with its own items and its own total.

Do I lose what I typed if the page reloads?

No. The form and the phase table are kept, and whatever is already saved takes priority when you come back.

Who changed this price?

Every change goes into the part’s history with date, time and user — and that same history comes out in the spec sheet PDF.

See all questions