Tool & Die and Machining
Every part has its own order: machine logging, actual production hours and the cost closing along with the delivery.
See the system with my own dataThe real cost of one order, broken down.
A day in this industry
The job is quoted in hours; the ship date, in hope
The steel arrives with a material cert that goes into a drawer. When the customer asks for it, someone goes digging.
The customer calls asking where the mold is, and the answer depends on someone walking out to the shop floor to look.
With Develop
One job per tool, and the numbers adding up when it ships
- The job is created from the approved quote
- Every operation is logged at the machine
- Material and outside processing go into the same job
- When it ships, actual cost next to the quote
What a tool and machine shop needs from a system
One-off part, its own job
- One job per tool, with the drawing and material certs attached
- Child jobs when one mold has many components — inserts, slides, cores
- The stages of your own process as the board’s columns, not a generic flow
- Job numbers in your shop’s format, including one that resets every year
Real machine hours
- Time logged by employee, machine and operation, on a touchscreen
- Downtime recorded with reason, start and end
- Available, busy and down hours by machine group
- Quoted operations side by side with actual operations
Steel you can trace
- Material requisition against the job, with the lot’s material cert
- Heat number linked to the customer and the part number
- Cost of the lot actually issued, not of the last purchase
- Purchases linked to the job, showing in its own tab
Outside processing along the way
- Outside processing for heat treat, coating or outside machining
- Parts tracked out to the vendor and back, so nothing sits forgotten
- Customer-supplied material shipped back without being billed as a sale
- Report of customer-owned material sitting in your shop
Inspection and delivery
- Control plan by customer and part, pulled up automatically at inspection
- Gauges and instruments with calibration interval and next due date
- Final inspection releasing by quantity, partial shipments included
- Shipping request with weight, package count and type of shipment
The modules that matter here: Projects, Production, Engineering, Quotes, Quality, and Invoicing.
What was the real margin on the last mold you shipped?
See the system with my own dataA reply by email within one business day, from a person on our sales team — not a bot.